1 / 5
| Customization: | Available |
|---|---|
| After-sales Service: | Video Technical Support/Online Support |
| Warranty: | 1year |
This equipment is designed for the rapid melting of massive and bagged asphalt. It solves common issues such as uneven heating aging, slow melting rates, and high energy consumption typical of traditional oil tanks.
| Applicable Products | Ton package Bitumen |
| Productivity | 10-15 t/h |
| Feeding Method | Hydraulic pressure Flap |
| Bitumen Heating Temp | 130°C |
| Bitumen Storage Capacity | 12t |
| Hydraulic Pump | Gear pump |
| Max Jacking Force | 6 t |
| Oil Working Temp | 200-250°C |
| Bitumen Pump Flow | 25 m³/h |
| Fuel Consumption | 4-6 kg per ton |
| Gross Power | 20 kw |
| Overall Dimension | 11500*2300*2400 mm |
Prizor Excavator