Basic Information
Pressure Type
Hydraulic Pile Driver
Certification
CE, ISO 9001:2000
Drilling Diameter
50-300mm
Specification
3250*2350*5000
Detailed Description
Our company is a professional construction machinery manufacturer specializing in highway guardrail pile drivers and PV post drivers. We have passed the International Quality Certification of ISO9001:2008. Our engineers are skilled in using AUTO-CAD, PRO-E, and UG to design products, ensuring high wear resistance and high torque for heavy-duty construction tasks.
Key Applications:
High-speed railways, highways, urban viaducts, light rails, bridges, high-rise buildings, PV power station installations, and farm/orchard construction.
Frequently Asked Questions
What is the main function of this pile driver?
It is designed for all kinds of PV post installation, making it the ideal choice for solar power station construction.
What kind of warranty is provided for the equipment?
The main machine comes with a 1-year warranty (excluding the hammer). During this period, broken accessories can be replaced with new ones. We also provide installation and operation videos.
What are the lead time and shipping methods?
Typically, the lead time is 3 days. Machines are primarily shipped via sea transport.
What payment terms are accepted?
We accept T/T (Telegraphic Transfer) or L/C (Letter of Credit) at sight.
Is the equipment customizable?
Yes, we provide customized services, including specific color requirements and configuration adjustments based on customer needs.
Does the machine meet international standards?
Absolutely. All products meet ISO9001 standards and have passed CE certification to ensure safety and quality in international markets.